Reporting – Natixis (2016)

Adoption Date:30 December 2010
Country of Headquarters:France
Region of Headquarters:Europe
Institutional Reporting Hyperlink:https://www.natixis.com/natixis/jcms/ala_5415/en/environmental-and-social-risk-management
Current EPFI Reporting Year/Period:2016
EPFI Reporting in Compliance:Yes

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the Equator Principles Association website.

Further information on this EPFI may be obtained through the Institutional Reporting Hyperlink above.

PROJECT FINANCE ADVISORY SERVICES

Total number mandated in the reporting period: 5

SectorTotal
Sub Total5
Mining
Infrastructure4
Oil & Gas
Power1
Others

RegionTotal
Sub Total5
Americas3
Europe, Middle East & Africa1
Asia Pacific1

PROJECT FINANCE TRANSACTIONS

Total number that reached financial close in the reporting period: 18

Totals5121
Totals5121
SectorCategory ACategory BCategory C
Mining2
Infrastructure15
Oil & Gas11
Power7
Others1
RegionCategory ACategory BCategory C
Americas141
Europe, Middle East & Africa36
Asia Pacific12
Country DesignationCategory ACategory BCategory C
Designated11101
Non-Designated42
Independent ReviewCategory ACategory BCategory C
Yes5121
No

PROJECT NAME REPORTING FOR PROJECT FINANCE TRANSACTIONS

No.Project NameSectorHost Country Name/ Project LocationYear of Financial Close
1Oyu TolgoiMiningMongolia2016
2OCTP - Vitol GhanaOil & GasGhana2016
3CBG - Compagnie des Bauxites de Guinée (Expansion)MiningGuinea2016
4Race Bank Offshore Wind Farm (Project Firebolt)PowerUK2016
5K3 CHP (Project Kemsley)PowerUK2016
6Parc Adfer (Project North Wales)PowerUK2016
7Liwa Plastics Industries Compex (Project LPIC)OthersOman2016
8MGT TeesidePowerUK2016
9Beatrice Offshore Wind FarmPowerUK2016
10Quintillon Subsea CableInfrastructureUSA2016
11Westconnex Stage 1 MA MotorwayInfrastructureAustralia2016
12Fermaca Pipeline La LagunaOil & GasMexico2016
13Fermaca Pipeline De OccidenteOil & GasMexico2016
14CPV TowanticPowerUSA2016
15Hawaiki Submarine CableInfrastructureNew Zealand2016

3 projects were not disclosed as per the disclosure conditions specified in Annex B of the Equator Principles.

PROJECT-RELATED CORPORATE LOANS

Total number that reached financial close in the reporting period: 1

Totals100
Totals100
SectorCategory ACategory BCategory C
Mining
Infrastructure
Oil & Gas1
Power
Others
RegionCategory ACategory BCategory C
Americas1
Europe, Middle East & Africa
Asia Pacific
Country DesignationCategory ACategory BCategory C
Designated1
Non-Designated1
Independent ReviewCategory ACategory BCategory C
Yes1
No

IMPLEMENTATION OF THE EQUATOR PRINCIPLES

Natixis’ implementation reporting is provided in their 2016 EP report available at: https://www.natixis.com/natixis/jcms/ala_5415/en/environmental-and-social-risk-management